Mechanical Projects


 
 
  • Conversion of an MTBE plant to iso-octane production: 330,000 man-hours, installation of 41,200 linear feet of pipe, 290 tons of structural steel, 3 columns, 10 vessels, 19 exchangers, 4 coolers, 
    18 pumps and motors, and miscellaneous mixers, filters, pots, and drums
  • Chemical plant in-line blending unit: 500,000 man-hours, installation of 60,000 linear feet of pipe, 
    650 tons of steel, 3 exchangers, cooler, 18 pumps and motors, and 8 storage tanks
  • Bulk storage tank farm expansion (25 tanks): 500,000 man-hours, installation of 76,000 linear feet of pipe (42”, 36”, 12”), 2 valve pits (3,200 cubic yards of concrete), 2 wing manifolds, and 10 can pumps

  • Grassroots butyl lithium unit: 150,000 man-hours, installation of 40,000 linear feet of pipe (HDPE, carbon, stainless), 160 tons of steel, 110 pieces of equipment (vessels, pumps, exchangers, agitators), 1,500 cubic yards of concrete, 111,000 linear feet of wire, 7,500 linear feet of conduit and cable tray, and 410 instruments